Search

x
Hu Jun, Du Juan, Li Yan, Guan Tong, Wu Yuwei, Wang Shucheng. Practice of BIM Technology on Utility Tunnel in Haikou[J]. Natural Science of Hainan Unversity, 2018, 36(1): 49-57. DOI: 10.15886/j.cnki.hdxbzkb.2018.0007
Citation: Hu Jun, Du Juan, Li Yan, Guan Tong, Wu Yuwei, Wang Shucheng. Practice of BIM Technology on Utility Tunnel in Haikou[J]. Natural Science of Hainan Unversity, 2018, 36(1): 49-57. DOI: 10.15886/j.cnki.hdxbzkb.2018.0007

Practice of BIM Technology on Utility Tunnel in Haikou

  • In our report, combined with the first pilot project of utility tunnel in Haikou, software and collaborative applications, model depth, deliver results were introduced. The model establishment, visualization, waterproof plan simulation, construction period simulation, construction progress report, and model pipeline early into the corridor and roaming animation were elaborated emphatically. The project has a certain representation, and which can provide a good demonstration for the extending of BIM designing to construction.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return