千年塔结构工程施工质量的监理

Supervision for the Engineering Structure Quality of the Century Tower

  • 摘要: 本文介绍了海南千年塔施工质量监理中遇到的几个问题及其解决方法, 并比较了灌注桩的水平变形比例系数m的试验值与规范推荐值的差别, 以及对非垂直“T”形连接的全熔透焊缝和《工程建设强制性标准条文》中个别条文的列入是否合理等问题进行了探讨.

     

    Abstract: The author introduced some problems and their solution which were encountered during the construction of the Century Tower, and made a comparison between the experience value and the recommended normal value of the horizontal deformation proportion coefficient "m" of cast-in-place pile. The author also dealt with the penetrated butt weld of non-vertical "T" shape connection, and discussed whether it was reasonable that some specific items were arranged in The Compulsory Provisions of Engineering Construction Standards.

     

/